Government – Metro Dives

Government – Metro Dives

Government – Metro Dives

The Chatswood dive site was established to support:
  • operation of two tunnel boring machines
  • construction of about 250 metres of new above-ground metro tracks and the realignment of the T1 North Shore Line
  • the fit-out of tunnel rail systems.
Marrickville dive site was established to manufacture pre-cast concrete tunnel lining segments and to support the:
  • operation of two tunnel boring machines
  • construction of 30 cross passages between the running tunnels from Marrickville to Barangaroo
  • construction of the Sydney Metro Trains Facility South
  • fit-out of the tunnel rail system.
N2 Engineering Consultants was engaged in the construction stage to develop the tender design to 100% coordinated design for construction purpose.
Services: Hydraulic and Fire Protection Services.