Government – Department of Industry, Orange
Developed by Verde Property, the $75 million project will cover a total floor space of 8,500m2 over four storeys. The site will provide on-site multi-level parking for 393 vehicles, including EV charging stations and end of trip facilities (showers, lockers and bike storage). The site holds a 5-star Green Star design 4.5-star NABERS rating for sustainable design and construction. Works are scheduled for completion in mid-2020.
N2 was engaged to develop the hydraulic design including fire hydrant and hose reel system from 70% tender level to ‘100% or construction’ level ie. workshop drawings and as-built drawings.